Construction


1: Ground is Excavated to a minimum of 600mm building1.jpg (101487 bytes) 2: Concrete to form foundation. 
Min: 150mm
building2.jpg (83742 bytes)
3: UnderBuildings to floor level. building3.jpg (97968 bytes) 4: Outer leaf cavity wall building4.jpg (90847 bytes)
5: Outer leaf cavity wall completed. building5.jpg (85727 bytes) 6: Inner leaf cavity wall showing air vents. building6.jpg (99115 bytes)
7: Damp proof membrane on blinding screed of sand. building7.JPG (87611 bytes) 8: Concrete solumn over damp proof membrane. building8.jpg (85118 bytes)
9: PVC cill fitted to dwarf wall - side frame erection begins. building9.jpg (156990 bytes) 10: Structural aluminium eaves beam fitted to head of frames. building91.jpg (124563 bytes)
11: Thermally clad aluminium glazing bars & ridge assembled. building92.jpg (160739 bytes) 12: Roof glazing panels installed. building93.jpg (81245 bytes)
13: Side frames glazed. building94.jpg (126803 bytes) 14: Internal fascia clipped on to eaves beam. building941.jpg (82385 bytes)
15: The completed conservatorie. building96.jpg (123042 bytes)
 